Skip to content
Construction

Construction and carpentry in El Paso, TX

Roofing Pros EPTX handles remodels and additions, carpentry and framing, and site work and cleanup across El Paso and the surrounding area. We are carpenters as well as roofers, which means one crew can take a project from framing through the roof to finish. Every job starts with a free estimate in writing.

Why the roofing and the building sit together

Two brothers with 20 years of combined experience in the trades put this company together, and carpentry is where it started. Roofing and framing are the same discipline at different heights: structure, water, and the joints between things. A crew that frames knows what is happening underneath a failing roof, and a crew that roofs knows what a new addition is about to ask of the roofline.

The practical result is that you are not coordinating a framer, a roofer and a finish carpenter yourself, and you are not refereeing when their schedules collide. It also means the awkward moments in a job get handled instead of stalling it. Tear-off exposes rotted decking, a bathroom wall comes open and the sill plate has been wet for years, an addition needs its new roofline flashed into an old one. Every one of those is a handoff at most companies and a Tuesday at ours.

Remodels and additions

Two different jobs that share most of the same skills. A remodel changes space you already have, and an addition builds new space onto the house. Both start with the same question, which is what the existing structure is doing and what it can be asked to do next.

You need an addition when there is genuinely no more room to work with: a growing household, a home office that is currently a corner of a bedroom, family moving in. You need a remodel when the square footage exists but the layout is wasting it, which is extremely common in older El Paso homes built as a collection of small closed rooms. Removing one wall between a kitchen and a living room often changes how a house lives more than an addition would, for a fraction of the money.

Additions carry two things people underestimate: foundation work matched to the soil at that address, and the joint where the new roofline meets the old one. That joint is where additions leak. Full detail is on the remodels and additions page.

Carpentry and framing

Framing is the skeleton, and finish carpentry is everything you actually touch. We do both. New framing on additions and new structures, structural repairs where wood has been carrying too much or has been wet too long, load-bearing changes with properly sized beams when a wall comes out, roof structure and decking, and then the other end of the trade: trim, doors, casing, built-ins, stairs and cabinetry.

You need framing work when something structural is wrong or is about to change. Sagging ceiling lines, doors that have stopped latching for no obvious reason, soft spots in a roof deck, rotted fascia or rafter tails, a wall you want gone. You need finish carpentry when a room needs to look built rather than assembled, which is a matter of scribing to what is actually there because no existing house is truly square.

Small jobs count. A single rotted board is a real call. See carpentry and framing.

Site work and cleanup

The least glamorous service on this page and the one that decides whether the rest of a schedule holds. Site work is clearing and preparing a property before the build, small structure and interior demolition, and debris removal and haul-off during and after the job.

You need it before a build so the crew that follows is not spending its first day on what was already there. You need it during a build because debris piles eat staging space, slow every trade walking around them, and are how nails end up in tires. You need it after a storm, after a tenant turnover, and at the end of any job, because the last hour of work is the part the customer actually experiences.

We do this for other builders and property managers as well as on our own jobs, where it is included rather than billed. See site work and cleanup.

Building for the Chihuahuan Desert

El Paso sits near four thousand feet in high desert, and it is hard on buildings in ways that are easy to underestimate. Ultraviolet exposure is severe across roughly three hundred sunny days a year. Humidity is very low for most of the year and then spikes during the summer monsoon. The gap between a July afternoon and the following pre-dawn is wide enough that every material on the exterior of your house expands and contracts daily.

What that changes: exterior wood is specified and detailed for sun rather than chosen on looks, movement gets planned for instead of fought, exposed end grain gets sealed or covered because that is where moisture moves fastest, fasteners and hardware are chosen for the exposure, and insulation and air sealing pay back faster here than in most of the country. Anything installed tight and bone dry in June will be under tension in January.

Soil, slabs and what is under the house

The ground is not consistent across this city. Up on the mesa and along the Franklins you tend to hit caliche, a hard cemented layer that is stable to build on but slow and expensive to dig. Down toward the river in the valley, soils are finer and hold more clay and silt, which means they move more with moisture.

Neither is a problem on its own. Both are a problem if a foundation is designed as though the other one were true. That is why an addition slab is not simply a smaller copy of the slab the house sits on: it has to be sized and reinforced for what is actually under it, and detailed where it meets the existing foundation so the two can move slightly without cracking each other. Where a scope genuinely calls for an engineer, we say so up front rather than guessing.

Permits, inspections and which office you are dealing with

Structural work, additions, and most projects that alter framing, plumbing or electrical need a permit. Inside the El Paso city limits that goes through the city. For an address in an unincorporated part of the county or in one of the surrounding towns, it goes through that jurisdiction instead. Which one applies depends on your address rather than your mailing city, and in this area those two are not always the same thing.

The effect you will feel is scheduling. Permitted work gets inspected at set stages, commonly after framing and rough-in and again at completion, and the job pauses at each point until the inspection happens. That is normal and worth planning around.

We tell you what your specific scope needs before work begins, including when the honest answer is that it needs nothing. What we will not do is start structural work without the permit it requires, because the person who pays for that at resale is you.

How a project actually runs

The order is the same whether the job is a bathroom or a room addition, and knowing it in advance makes the whole thing less stressful. Scope and estimate first. Then permitting where the work needs it. Then demolition and site preparation. Then any structural work, framing and, on an addition, the roof. Then mechanical rough-in and the inspection that goes with it. Then close-up, finishes and trim. Then final cleanup and a walk-through.

The stages that most often stretch are permitting and inspection timing, material lead times on anything special ordered, weather during the summer monsoon when nothing that has to stay dry can be left open, and change orders. Changes are normal and allowed, and every one of them costs time as well as money. We will tell you which is which when you ask for one, before you decide.

What the free estimate gets you

There is no charge for the visit and no charge for the written estimate. We do not price construction over the phone, because a number given before anyone has seen the house is either padded to be safe or optimistic enough that it will change later, and you cannot compare bids honestly against either one.

What you get back is scope, what is included, what is specifically not included, and the schedule as we actually expect it to run rather than the best case. Exclusions are the part worth reading, because that is where a cheap-looking bid usually turns out to be a partial one.

There is no pressure on the visit and no price that only holds if you sign that day. Start at free estimate, or call and describe it and we will tell you whether it is worth a trip.

Living in the house while the work happens

Most remodel clients stay in the house, which is workable when everyone agrees on the ground rules in advance: which rooms are the work zone, where the crew parks and stages material, where dust barriers go, and what time the day starts.

Desert dust and construction dust together are worse than either alone, so containment is not optional. Work areas get sealed off, debris gets removed as it accumulates rather than accruing in the driveway, and the site gets swept at the end of each day. On a street with narrow access, which describes a lot of central and valley El Paso, we work out where a truck or a container can sit during the estimate visit rather than on the first morning.

Residential and commercial

Homeowners are most of this work, but not all of it. We take on commercial and light commercial projects, work for builders and general contractors who need framing or cleanup as part of a larger program, and recurring work for property managers handling turnovers across a portfolio.

What a contractor or manager wants from a trade partner is different from what a homeowner wants. It is mostly schedule reliability: a committed day that holds, and an early phone call rather than silence when something genuinely goes wrong. That is a fair thing to be judged on and we would rather be judged on it than on adjectives.

Where we work

El Paso and the surrounding area, including central El Paso and the Lower Valley, the east side, the northeast and around Fort Bliss, the west side and Upper Valley, and out along the valley to Horizon City, Socorro, San Elizario, Clint and Canutillo.

The building stock varies a lot across that spread, and so does the work. Older central and valley homes bring small closed floor plans, original framing with decades of repairs layered on, and more flat and low-slope roofs. Newer development east and toward Horizon City brings pitched shingle roofs, younger structures, and more room additions on lots that still have space to build on.

Town pages are under service areas. If you are at the edge of that area, ask, and you will get a straight answer either way.

Also from us

Frequently asked questions

Do you do construction work as well as roofing?

Yes. We are carpenters as well as roofers, so remodels, additions, framing and site work are our own trades rather than something we subcontract out. Carpentry is where this company started, and the roofing side grew out of it rather than the other way around.

Can one crew handle both the roof and the addition?

That is the point of working with us. An addition has to be tied into the existing roofline, and that joint is where additions most often leak. The people framing it are the people who understand the roof, so nobody is pointing at another trade when the transition is what fails.

Do you take on commercial construction work?

We work residential and commercial. Tell us the scope and we will tell you plainly whether it is a fit. We would rather turn a job down early than take something that is not ours and learn that halfway through it.

Do I need a permit for my project in El Paso?

Structural work, additions, and most changes to framing, plumbing or electrical do. Which office issues it depends on whether your address is inside the El Paso city limits, in an unincorporated part of the county, or in one of the surrounding towns, and your mailing city is not always the answer. We confirm before work begins.

How long does a remodel or an addition take?

A bathroom or a kitchen with no structural change is measured in weeks. A kitchen involving a load-bearing wall runs longer because structural work must be inspected before anything closes up. A room addition is measured in months once design, permitting, foundation cure, framing, roofing, rough-in, inspections and finish are all counted.

Is the estimate free, and will you quote over the phone?

The visit and the written estimate are both free. We do not quote construction over the phone, because a number given before anyone has seen the house is either padded to be safe or optimistic enough that it will change later. Neither one helps you compare bids honestly.

What happens if you find rot or damage once things are open?

We stop, show you what we found, and price the repair before continuing rather than covering it quietly. Rotted framing gets cut back to sound wood and replaced properly, and the reason it got wet gets fixed. That is our own trade, so it does not mean waiting on another contractor.

Will you clean up as you go?

Yes, and it is not a separate charge on our own jobs. Debris comes out as it accumulates rather than piling up in the driveway for a month, work areas get sealed off from the rest of the house, and the site gets swept at the end of the day rather than at the end of the job.

Get a free estimate

Tell us what is going on and we will come look at it. Straight answer, written price, no pressure.